Friday, 15 May 2020

Series 2, Episode III

After falling asleep at the end of reference 1, Grandpa did wake up in time to take his bread out of the oven. After which he turned his mind to pyramids again and decided that he had better supervise the construction of a proper pyramid, with the result snapped left.

The joints are all properly bonded, that is to say every joint is topped and tailed by another brick, rather than continuing to another joint above or below.

The isolation room for Baby Bear has been made just a touch bigger, although that has not stopped him moaning about it. Perhaps he will be let out next week.

The ceiling in the main chamber has been lowered, and Polly now has some planks to stand on, so that she can reach it, and a large piece of blue chalk with which to decorate it. Pedro and Yuri stand ready to help by holding the bottom end of the piece of chalk, rather large for Polly to manage by herself.

And both the climbing sticks have been installed, should anyone want to climb around on the outside of the pyramid.

Much better.

Reference 1: http://psmv4.blogspot.com/2020/05/series-2-episode-ii.html.

Group search key: wwwy.

No comments:

Post a Comment