Saturday 13 March 2021

Newish house

The former bungalow, work on which has been stopping and starting for more than three years now, appears this morning to be occupied, with all the builders' fences down, side gate installed and car on the front drive. Let's hope the buyer had a proper survey done, given the novel construction methods and various vicissitudes along the way. See, for example, references 1 and 2.

An even longer runner than the express prefab, final notice of which is to be found at reference 3.

PS: I didn't think to take a photograph this morning, so this snap from Street View will have to do instead. The legend at the bottom of the screen says image capture March 2018 - in which connection see reference 4.

Reference 1: https://psmv3.blogspot.com/2017/10/bungalow-up.html.

Reference 2: https://psmv3.blogspot.com/2017/09/building-works-or-not.html.

Reference 3: https://psmv4.blogspot.com/2020/11/the-express-from-munich.html.

Reference 4: https://psmv4.blogspot.com/2021/03/minor-puzzle.html.

No comments:

Post a Comment