Friday 29 November 2019

Express building

I first noticed the prefab going up in a road near us towards the end of August, then again at the end of September, this last at reference 1.

I can now report that, three months into this express building project - with my having thought that one of the points of prefab was express - we have got as far as a raft on which to build the thing. There are also an impressive number of drain covers, which makes me slightly cross with myself that I did not work harder to get at least one of the many cast iron drain covers that must, by now, have been removed. Sadly, there never seemed to be a good moment to ask.

And unless they have parked the portaloo on top of the entrance to the cellar, one can only suppose that the entrance - that is to say the hole in the raft - is in the cage behind. It seems most unlikely that there would be anything other than a hole at this stage. Hopefully covered, so that the cellar is not full of water, vermin and windblown rubbish by they time they get around to finishing it.

Maybe a move-in over Easter?

PS: hopefully also, the tilt of the raft is due to the tilt of a telephone held up against the wire mesh, rather than to any failure of their Dumpy Levels.

Reference 1: https://psmv4.blogspot.com/2019/09/people-who-are-loaded.html.

No comments:

Post a Comment